Badezentrum Sindelfingen

The extension of Badezentrum Sindelfingen swimming centre continues the qualities of the existing indoor pool from 1976 with its characteristic, self-supporting wooden roof, and offers swimming with a view of the countryside. The new building blends naturally into the existing topography. A large, unifying landscape roof accommodates the newly created areas of the family pool and the sauna world. Together with the existing buildings, it forms the spatial conclusion of the spacious outdoor pool area. The swimming pools are arranged linearly to form a coherent water world with the best possible outdoor access. This ensures that the building is easy to navigate.

48° 43' 9" N 9° 1' 2" W

Competition

1st Price

Planungswettbewerb

Client

Stadt Sindelfingen, Sport- und Bäderamt, Sindelfingen

Architects

Auer Weber, Stuttgart

Project control

Kubus360 GmbH, Stuttgart

Outdoor facilities

grabner huber lipp landschaftsarchitekten, Freising

Structural engineering

Schneck Schaal Braun, Tübingen mit IBK Prof. Kirsch Ingenieurgesellschaft mbH & Co KG, Stuttgart

Technical equipment

Ingenieurgesellschaft H+H, Leonberg (HVS)

Ib/h2 Ingenieurbüro für Elektrotechnik, Reutlingen (ELT)

Building physics

Kurz und Fischer GmbH, Winnenden

Fire protection

Kuhn Decker GmbH & Co. KG, Böblingen

Top