New Therme Oberstdorf
The new Therme Oberstdorf spa complex is adapted and integrated into the structure of this open development of detached buildings on the outskirts of Oberstdorf. Offset gables create a pleasant scalability and allow interlocking with the open space to the east as well as views from the spa complex of the impressive mountain scenery. The gabled roofs, typical of the region, have a pared-down, modern design language, and the wood cladding is all-encompassing. The choice of materials and construction method meant a short construction time and will ensure low-cost maintenance in the future. The outdoor areas of the spa use the topography to create a variety of areas for guests.
Competition
1.Preis
2019
Start of Construction
2021
Completion
2024
Client
Markt Oberstdorf Tourismus
Architects
Auer Weber, Stuttgart
Project control
Hitzler Ingenieure e. K., München
Outdoor areas
Grabner Huber Lipp Landschaftsarchitekten, Freising und
Stadtplaner Partnerschaft mbb, München
Structural engineering
Konstruktionsgruppe Bauen AG, Kempten
Technical equipement
L&P Beratende Ingenieure GmbH, Haar (HLS)
Planungsgruppe VA GmbH (ELS)
Fire protection
Weldishofer - Ingenieurbüro für Brandschutz