[Translate to English:]

Primary school Theodor-Fischer-Straße, Munich

Planned in accordance with the “Lernhaus” educational concept, this school building is articulated into three volumes – primary school, sports hall and ancillary structure – which are laid out along the streets adjoining the site. Screened off acoustically from the surroundings to a large extent, a central feature of the development is the sheltered playground with a school garden and planted play areas. Environmentally, special attention was paid to the heights of the structures in relation to the small-scale, two-storey housing on neighbouring sites. The scheme is graduated in height from west to east, with a four-storey section along the Pasinger Heuweg, followed by a three-storey volume along the Theodor-Fischer-Strasse and ending with the single-storey sports hall.

48° 10' 58" N 11° 26' 56" W

Compettion

2017

Start of construction

2019

Completion

2022

Client

Landeshauptstadt München
vertreten durch Landeshauptstadt München - Baureferat Hochbau

Architects

Auer Weber, München
Maximilian Kneucker (project manager),
Johanna Zinnecker, Peter Graf (employees)

 

CEF measures / Compensatory areas

Angelika Uhland, landscape architect, München

Outdoor facilities/ areas

realgrün landscape architects, München

Structural engineers

Behringer Beratende Ingenieure GmbH, München

Mechanical services

Ingenieurbüro Hausladen GmbH, München

 

Building physics

Kurz und Fischer, Feldkirchen-Westerham

Fire protection

Kersken + Kirchner GmbH Beratende Ingenieure VBI, München

room acoustics

Ebert Ingenieure GmbH, München

 

Top