Secondary school Franz-Mader-Straße, Munich

The site for the new school building borders on the northern edge of the busy Allacher Straße. To reduce noise and safety risks, the elongated four-storey block of the new school building, the children's house and the partially buried sports hall and grandstand are arranged protectively around the south-facing schoolyard. This is also where the entrances to the school building are located. The area is accessed via a newly created pedestrian and bicycle path in the south.

With its many unsealed and landscaped areas as well as the large tree plantings in the schoolyard, the new school campus blends into its green surroundings. The school garden, which is integrated into the building on two terraces, and a facade greening that wraps around the building over a frame structure in front of it, continue the green idea. Climate-friendly and natural building materials and earthy, mineral shades reflect ecological awareness. The wooden formwork of the upper floors lends the building a lightness and naturalness. In contrast, the exposed concrete base is kept in earthy mineral tones.

48° 10' 13" N 11° 30' 22" W

Compitition

2018

VgV-Verfahren

Start of construction

2023

Completion

2026

Client

Landeshauptstadt Munich, Referat für Bildung und Sport, Baureferat (Projektleitung)

Architects

Auer Weber mit Wenzel+Wenzel (Lph 6-8), Munich

Project management

Stein und Partner Projektmanagement, Munich

 

Outdoor facilities/ areas

Realgrün Landschaftsarchitekten, Munich

Structural engineers

Sailer Stepan Partner, Munich

Technical equipment

IB Bauer, Unterschleißheim (HLS)
IB Schicho,
Regensburg (ELT)

Building physics

BZS-Bauphysik, Augsburg

Fire protection

Kersken + Kirchner GmbH Beratende Ingenieure VBI, Munich

Room acoustics

BZS-Bauphysik, Augsburg

Top