[Translate to English:]

Sports Campus Clermont-Ferrand

On the pentagonal site, several independent functions are grouped around a central area: the main entrance with a green parking lot, a tree-lined path, an "adventure wood", an orchid garden, a tennis area with six tennis halls and a club house, the soccer and rugby stadium as the central element, which, along with the encircling running tracks and long-jump areas, forms an oval. 

45° 45' 38" N 3° 5' 4" W

Competition

2016

Start of construction

2018

Completion

2021

 

Client

Stadt Clermont-Ferrand

Clients consultancy

Assemblia, Entreprise publique locale (EPL), Clermont-Ferrand

Architects

Auer Weber, München

 

Partner architect

mBa Architectes, Clermont-Ferrand; Christian Blanchet (Managing Director)

Outdoor facilities

Agence TER, Paris

Sport facilities engineer

PR-Sport, Labenne (Design planning), Osmose Ingénierie (late performance phases), Marquette-Lez-Lille

Structural engineering, Technical equipment, Cost planning

Egis Bâtiments, Clermont-Ferrand

Project control

Arpège Ingénierie, Caluire

signalling

Franz Göttler und Dominik Schwarz, München

Top