<p>The major challenge in the general renovation and conversion of the Münchner Stadtmuseum is reconciling the protection of a historical monument with the future requirements of a modern museum build
Projects
<p>Planned in accordance with the “Lernhaus” educational concept, this school building is articulated into three volumes – primary school, sports hall and ancillary structure – which are laid out alon
Projects
<p>The extension of Badezentrum Sindelfingen swimming centre continues the qualities of the existing indoor pool from 1976 with its characteristic, self-supporting wooden roof, and offers swimming wit
Projects
<p>The historical ensemble of the Alter Hof was complemented in such a manner, that the former castle could easily be identified as a spatial entity within the urban context. Continuous eaves, closed
Projects
<p>The 2-stream secondary school Helen Keller (1992, also by Auer Weber), an exemplary school building at the time of its construction, is to be developed into a 6-stream secondary school in line with
Projects
<p>The existing school buildings, dating from various periods, were demolished, except for the main building from 1912, standing opposite the Church of the Passion of Christ. They are substituted by n
Projects
<p>The design envisages a school ensemble consisting of three different-height structures and a gymnasium. Arranged on the northern part of the site, they form a counterpart to the listed elementary s
Projects
<p>A diagonal bridge connecting the insurance company's existing main administration building with the new administration building breaks the orthogonality of the perimeter block development chosen fo
Projects
<p>The new train station building and the redesigned train station plaza are transformed to a representative and inviting city entrance and form a flowing transition from downtown area up to the train
Projects
<p>In Bad Wiessee, a new village centre is being built on the former Ritter site not far from Lake Tegernsee. A total of six buildings will be arranged around two height-offset squares, and functional
Projects